BIM Engineering & MEP Design Services
Water supply & drainage design, as-built and scan-to-BIM modeling, external utilities design, and BIM implementation for companies. I work with design firms, developers and direct clients worldwide, remotely.
How I work
- ● Remote work — most tasks are completed without a site visit
- ● On-site visits — available when needed for surveys, scan control or on-site coordination
- ● Available for clients worldwide, in any time zone (based in Thailand, UTC+7)
- ● Experience — wastewater treatment plants, industrial facilities, public buildings (schools, kindergartens, hospitals), premium-class offices
Five areas of work
Each task can be ordered separately or as a package — depending on what you already have as a starting point.
MEP Design — Water Supply & Drainage
Development of water supply and drainage design packages: calculations, specifications, working drawings, coordination with architectural, structural, HVAC and other disciplines.
Discuss your project →As-Built BIM Modeling (Reverse Engineering)
Creating information models of a facility from existing drawings, survey data or scan results — for cases where no digital model exists yet. Including preparation of models from 2D documentation to meet review/compliance requirements.
Discuss your project →Point Cloud to BIM Modeling
Creating a BIM model from an already processed laser-scan point cloud (registration and cleanup done by the client or at a previous stage). Output — a model ready for further design work.
Discuss your project →External Utilities Design & Site Coordination
Design of external water supply and sewerage networks, coordinating utility routing with the site master plan and other services.
Discuss your project →BIM Implementation for Companies
Helping companies adopt BIM: setting up information modeling processes, standards and workflows at an organizational level. Experience leading a BIM department at one of the largest companies in Russia, growing it from 3 to 21 specialists.
Discuss your project →Examples of past work
Examples of completed projects and areas of work.
Lyubertsy Wastewater Treatment Plant
One of the largest wastewater treatment plants in Europe (design capacity of about 3 million m³ of wastewater per day), near Moscow, Russia, operated by Mosvodokanal. On this project I worked on the heating, water supply and external utilities design packages, and took part in commissioning.
Industrial Facility
Developed heating, water supply, fire water supply and fire suppression system design packages.
Public Building
Worked on major facilities: sports complexes, schools, kindergartens and office buildings.
Scan-to-BIM Modeling
An example of building a BIM model from a point cloud — overlaying the model on the original scan data to verify accuracy.
External Utilities Design & Site Coordination
An example of an external water supply and sewerage network model with routing coordinated across the site.
Denis Golev — BIM Engineer, MEP Designer
MEP design engineer and BIM practitioner: I run projects from calculations through handover — from one of the largest wastewater treatment plants in the world (Lyubertsy Wastewater Treatment Plant — heating, water supply and external utilities design, plus commissioning) and Ø1200 mm trunk water mains up to 30 km long, to internal water supply and drainage systems for residential, public and social facilities.
I work both remotely and on-site — for surveys, scan quality control, or working alongside a design team in person. Available for clients worldwide, based in Thailand (UTC+7).
- Revit
- Navisworks
- Recap
Approach to work: accurate calculations, compliance with applicable codes and standards, clear deadlines and transparent communication with the client at every stage.
Why work with me
Quoted individually
There's no fixed price list — cost depends on the specifics of your project and scope. Send me the details through the form or directly, and I'll reply with a preliminary timeline and cost estimate.
Request a quote- 01 Facility size/volume and complexity of the MEP systems
- 02 Format of the source data (drawings, survey data, point cloud)
- 03 Required level of model detail (LOD)
- 04 Need for third-party compliance/design review
- 05 Project timeline
Let's discuss your project
Describe the facility and what you need done — I reply within one business day.